August 2015.Heads done. I bought some shims from precission shims in croydon. Great service ordered monday arrived tuesday. So new valves installed, lapped, valve lash measured, shims replaced as tequired , cams instaled torqued up and clearances measured again. Set at .30to .35 ex .20 to25inlet. Job done!
Thursday, 6 August 2015
Monday, 13 July 2015
Friday, 7 November 2014
7th November 2014 heads stripped of all the bits . 2 of the sodium filled exhaust valves decided to shear at the stem head junction.
They seemed perfectly ok until I gave the spring compressor a bit of a tap to loosen the collets. Didnt take a lot to fall apart. Good thing I decided to change them for more modern metalurgy.
Monday, 29 September 2014
Friday, 26 September 2014
25Sept 2014
Finally rigged up the crane and pulled the engine out. Tight as'!!
Had to remove front heat shield and front manifold mid lift. The two long studs from the rear rocker cover got stuck under the deck lid latch. I was going to remove them but could not find a stud remover the right size.
Did not remove the engine mounts or the clutch housing . Used an old carpet to protect the paint and rear window.
Finally rigged up the crane and pulled the engine out. Tight as'!!
Had to remove front heat shield and front manifold mid lift. The two long studs from the rear rocker cover got stuck under the deck lid latch. I was going to remove them but could not find a stud remover the right size.
Did not remove the engine mounts or the clutch housing . Used an old carpet to protect the paint and rear window.
Subscribe to:
Posts (Atom)


























